[Shop-talk] Metal building w/out slab?

Randall tr3driver at ca.rr.com
Wed Jun 6 20:17:44 MDT 2012


Just out of curiosity, why are the beefy headers required with cement, but
not with soil cement?

My Dad went through the same problem, the building inspector required
headers that doubled the volume of concrete, for what was basically a
covered driveway.

-- Randall 


More information about the Shop-talk mailing list