[Mgs] MGB O/D Driveshafts
WSpohn4 at aol.com
WSpohn4 at aol.com
Mon Sep 24 11:30:36 MDT 2007
In a message dated 9/24/2007 10:20:20 A.M. Pacific Daylight Time,
doddk at mossmotors.com writes:
3 synch 4 spd - Early Banjo short 30"
3 synch OD - Early Banjo Med. 31.125"
3 synch OD - Saulsbury Long 32"
4 synch 4spd/OD - Saulsbury Med. 31.125"
____________________________________
Nice to have that table, Kelvin.
For those going to an OD on the early cars with banjo axle, the alternatives
are to have a longer driveshaft made up, or to machine a spacer and use
longer bolts. I have done the latter quite successfully, but I'd make sure to use
grade 8 bolts and to have the spacer machined so that it fits properly into
the third member flange and the driveshaft.
Nice not to have to worry about it on Salisbury axled cars
Bill
More information about the Mgs
mailing list