[Healeys] BN2 Assemble order

T+ B Willig willig at wtnet.de
Tue Jan 25 13:52:27 MST 2011


Ola Jose,

I started to assemble my BN2 in the following order:

front suspension and steering
rear suspension and steering 
handbrake mechanism (now I had a rolling chassis, that could be stopped by
the handbrake if necessary)
wiring
instrument panel and instruments 
brake lines
fuel lines and fuel pump
engine + gearbox
radiator

After that I started the engine and checked for leaks and made the first
adjustments to carb and ignition.

Only after all that I fitted to front shroud and front wings to the car. It
helps tremendously to have free access to all the places in the engine bay
and behind the instrument panel.

Good luck


Thomas Willig


More information about the Healeys mailing list