mgb-v8
[Top] [All Lists]

Re: Crane HI-6

To: mhartwig@cbu.edu
Subject: Re: Crane HI-6
From: MRogers726@aol.com
Date: Fri, 25 Sep 1998 00:45:42 EDT
Cc: mgb-v8@Autox.Team.Net
Reply-to: MRogers726@aol.com
Sender: owner-mgb-v8@Autox.Team.Net
In a message dated 98-09-24 21:24:31 EDT, you write:

<< 
 How can one determine the clearance?  Is this an exercise in geometry
 or what, or do I just talk to everyone under the sun to find the guy
 who has bent rods and valves from valve meeting piston.
 
 jay and mike
  >>
There are two important parameters to consider: 
will the valves open that far without coil bind.  This involves determining
what the valve lift will be and putting a dial guage on the valves and prising
them open to check.
The other is to use an old gasket and install a head, rocker and etc with a
blob of putty spread on top of the piston to see if there's at least .050"
clearance. If not braze a piece of ring to an old valve to use as a cutting
tool to make the necessary room using a drill on the stem.
Regards;
Michael*  

<Prev in Thread] Current Thread [Next in Thread>