Most ironically, I originally made the 8th station sign only because it
fit on the amount of particle board sheets we had bought. Grid A,B,2-2
driver, 8 stations-and the math was easier at the for hardware store.
When we made those it was at the same time the worker signup sheets were
revised to include the station numbers, and the combination of those two
small changes turned out to be one killer time saver.
I remember when you just had to stand with the checklist and scan the
course and point vaguely to an empty part of the site.
tony
>
> FWIW, there are 8 station signs. We occasionally put out all 8, usually
> only 7 or sometimes 6 for our shorter courses.
>
> As we are designing our courses now (i.e. being blessed with relatively
> large sites and thus spread out courses), 7 stations is usually appropriate
> IF you want to avoid reruns and holding the start.
|