[Tigers] Prepping for lots more HP cont.

wsamouce wsamouce at kc.rr.com
Tue Dec 7 06:31:35 MST 2010


http://i796.photobucket.com/albums/yy249/samouce/002-11.jpg

 

http://i796.photobucket.com/albums/yy249/samouce/001-8.jpg

 

Right side is about ready. Screws are to hold pieces in place for welding.
The bolt is to insure the plate is perfectly placed. They will then be
removed and screw holes filled. Once everything is tacked in place a hammer
can be use to shape the pieces for smaller gaps for welding. 

I NEED A LIFT. 

Start on the left side tonight. It should go much quicker due to my
experience on the right side.

 

Duke

B382002037


More information about the Tigers mailing list