    <p>Since we've drifted a little bit off-topic (and we likely have
      too much free time now), here's my story about emergency
      generators. At the time I was working (RN) night shift in a
      hospital ICU. Every Tuesday about 6am the hospital would test
      their emergency generator. It was supposed to be a quick blink
      from regular power to emergency power. Except in our ICU (and only
      the ICU) the power would be off for 3-5 minutes! Not fun when you
      have patients on ventilators that did not have battery back-up. It
      got so bad I would remind my staff to stand by with flashlights
      and manual Ambu bags every Tuesday morning. <br>
    </p>
    <p> I complained to the engineering department but they insisted the
      power would only be off for a few seconds at most. I finally
      convinced the chief engineer to come sit in our unit on a Tuesday
      morning. He did, the power went off for a full 5 minutes and the
      color drained from his face. Whatever was the problem finally got
      fixed. <br>
    </p>
    Eric Russell<br>
    Mebane, NC <br>
    <div class="moz-cite-prefix"><br>
    </div>
    <div class="moz-cite-prefix">On 4/24/2020 10:30 AM, Al Fuller via
      Shop-talk wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:09ce01d61a44$deb43a60$9c1caf20$@gmail.com">
      <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
      <meta name="Generator" content="Microsoft Word 15 (filtered
        medium)">
      <style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:11.0pt;
        font-family:"Calibri",sans-serif;}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:blue;
        text-decoration:underline;}
.MsoChpDefault
        {mso-style-type:export-only;
        font-family:"Calibri",sans-serif;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]-->
      <div class="WordSection1">As regards the comment you made below
        that the generators get exercised 30 minutes a week: Please keep
        in mind that its sounds like you meant to say the diesel engines
        get exercised [as opposed to the generators]. <o:p></o:p>
        <p class="MsoNormal"><o:p> </o:p></p>
        <p class="MsoNormal">The difference is the generator set also
          includes the transfer switch, wiring and other components. I
          had one client that fired up the diesel weekly, but when a
          wind storm blew down the power lines, the facility was down
          for a week while they tried to locate a new transfer switch.
          It turned out the building housed a lot more people and
          equipment than when the generator set was first specified and
          the switch set couldn’t support the load.  It was very
          frustrating to have a working diesel generator, but unable to
          power the building!<o:p></o:p></p>