Hello everyone Can any one explain if it is possible to install two of the same vertical links on the Tr6.? Are there right and left threads to keep stearing arms level? Relative to each other. Does it matter which side gets the left hand thread.Lastly are the stearing arm plates inter changeable? Thanks for the help Rob