All depends on what is needed in the rebuild.
Bill Hutton does good Climax work. Not cheap, but very knowledgeable
and reliable.
I have had 2 litre engines by both Wentz and Ivey and both do very good
jobs. There are several others, but those two I have personal
experience with, as well as Hutton. Recommend them all.
Labor cost on a 2 litre rebuild at Wentz is $2400 plus parts, and that
includes around $300 in dyno time.
A new engine, turn key, is around $12,000 give or take.
Hope this helps.
Larry Dent
|