- 1. 1975 1500 Rebuild time (score: 1)
- Author: "Jeff Wilson" <jwilson@accmail.umd.edu>
- Date: Sun, 30 Jul 2000 13:57:24 -0400
- Head Work, Thoughts on Head milling (amount) and increasing the Size of exhaust valves (size - type), I have already secured a higher performance cam and Webber down draft and would like to hear of a
- /html/spitfires/2000-07/msg00972.html (7,077 bytes)
- 2. Re: 1975 1500 Rebuild time (score: 1)
- Author: "Michael Hightower" <mphtower@erols.com>
- Date: Sun, 30 Jul 2000 20:13:59 -0400
- Hi Jeff, I'm pretty new to the list, but I have a modified 1500 Spitfire. Here's what it is equiped with: .020" overbore Stage II cam (don't know what the profile is for that) Ported/polished head So
- /html/spitfires/2000-07/msg00977.html (8,252 bytes)
- 3. Re: 1975 1500 Rebuild time (score: 1)
- Author: "L&B Lubbers" <lubbers@sympatico.ca>
- Date: Sun, 30 Jul 2000 21:56:13 -0400
- I would be interested to hear what a stock '79 Spitfire (with catylitic converter, air pump) was expected to do when new. Len Lubbers Ottawa, Ontario 79 Spitfire
- /html/spitfires/2000-07/msg00981.html (7,183 bytes)
- 4. Re: 1975 1500 Rebuild time (score: 1)
- Author: "Terry L. Thompson" <tlt@digex.net>
- Date: Mon, 31 Jul 2000 09:56:18 -0400
- In the U.S. a 1975 (low compression 7.5:1, single ZS, California model 1493 cc) I believe was listed at 15.4 seconds 0-60 mph (0-97kph). The European 1975 (9.0:1 compression, dual HS4 equipped, non-
- /html/spitfires/2000-07/msg00990.html (9,338 bytes)
- 5. Re: 1975 1500 Rebuild time (score: 1)
- Author: "Terry L. Thompson" <tlt@digex.net>
- Date: Mon, 31 Jul 2000 10:47:45 -0400
- Sorry, that .315 variance on the MB SLK230 should be .485 or a half a second from factory spec. (The math portion of my brain must be a bit off.) -Terry variance
- /html/spitfires/2000-07/msg00992.html (7,351 bytes)
- 6. Re: 1975 1500 Rebuild time (score: 1)
- Author: Tburke4@aol.com
- Date: Mon, 31 Jul 2000 10:55:46 EDT
- << Sorry, that .315 variance on the MB SLK230 should be .485 or a half a second from factory spec. (The math portion of my brain must be a bit off.) -Terry >> Terry, I'm no mathmatician, but, given t
- /html/spitfires/2000-07/msg00993.html (7,296 bytes)
- 7. Re: 1975 1500 Rebuild time (score: 1)
- Author: Joe Curry <spitlist@gte.net>
- Date: Sun, 30 Jul 2000 21:03:55 -0500
- Call British Parts Northwest. They have the correct valves and know what you need. Tell them your situation and they will sell you the valves at a reasonable price. Joe
- /html/spitfires/2000-07/msg00996.html (7,367 bytes)
This search system is powered by
Namazu