Hey Everyone,
On the "Mini Baja Official Costing Sheet", what is the difference between
the "Labor" column under "Subassembly Costs" and the column titled with
"Fab. Cost Labor"?
The way I interpret it is the Fab. Cost Labor is the cost of labor to
assemble the subassembly pieces and the Subtotal's "Labor" column is the
total of the Subassembly Labor Cost and the Fab. Labor Cost. Is this
correct?
Thanks,
Luigi DePari
Tri-State University