Subject: | [Healeys] BN2 Assemble order |
---|---|
From: | willig at wtnet.de (T+ B Willig) |
Date: | Tue, 25 Jan 2011 21:52:27 +0100 |
References: | <AANLkTinDKCPc2ycu2M=qA6TLE6b1vPweV4Wnk2b=cnyp@mail.gmail.com> <341749.83963.qm@web161405.mail.bf1.yahoo.com> <AANLkTimngbN1X-wJeWkUh0FPq+Csn2ut4mop6Am1fgmT@mail.gmail.com> <550185.82471.qm@web120506.mail.ne1.yahoo.com> |
Ola Jose, I started to assemble my BN2 in the following order: front suspension and steering rear suspension and steering handbrake mechanism (now I had a rolling chassis, that could be stopped by the handbrake if necessary) wiring instrument panel and instruments brake lines fuel lines and fuel pump engine + gearbox radiator After that I started the engine and checked for leaks and made the first adjustments to carb and ignition. Only after all that I fitted to front shroud and front wings to the car. It helps tremendously to have free access to all the places in the engine bay and behind the instrument panel. Good luck Thomas Willig |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [Healeys] BN2 Assemble order, T+ B Willig |
---|---|
Next by Date: | Re: [Healeys] BJ8 Parts wanted, Rich C |
Previous by Thread: | Re: [Healeys] BN2 Assemble order, T+ B Willig |
Next by Thread: | Re: [Healeys] BN2 Assemble order, WILLIAM B LAWRENCE |
Indexes: | [Date] [Thread] [Top] [All Lists] |